Are you interested in an accessory dwelling unit in Fullerton, CA? This firm specializes in a three-step building process. First, they obtain architectural design drawings, showing you the project. Next, they handle the permit processing. They bring out their structural engineers to construct the project at the end.
How Long Does an ADU Take to Build?
Typically, it takes about 4-6 months for the complete construction cycle. From the time the project breaks ground, it takes about half a year on average, so plan accordingly.
The Full Process From Start to Finish
• Measure Home, Design Project, Consult With Owner
• After the Design’s Acceptance, They Move on to Structural Engineering and Title 24
• Move on to City Planner for Go Ahead
• Project Kickback & Readjustment
• After Approval, Permits Are Pulled, and Ground Is Broken
Benefits of Adding an ADU to the Property
Most ADU projects have one to two bedrooms, a bathroom, and a small kitchen. These can be used in many ways:
• Host Visiting Guests & Family Members
• Work From Home in a Detached Office
• Give the In-Laws Somewhere to Stay
Over the past five years, the United States has seen steep increases in housing costs. This increase has been coupled with a rise in demand for affordable housing. ADU construction rates have risen in response to these market changes, addressing demand.
Rental Unit to Generate Passive Income
After building the ADU, it can be utilized as a passive income machine. Rent the space out on a daily, weekly, or monthly basis after its completion.